Potobelo
ODM Cookware Manufacturing at the Potobelo / Zoombo stainless steel cookware factory

Custom solutions

ODM Cookware Manufacturer

Our design and tooling, your brand — a shelf-ready line without the engineering lift.

  • Sampling 7–10 days
  • Production 30–50 days
  • MOQ from 1,200 pcs / model

Who it’s for

For retailers and brands that want a ready-to-brand line without running their own product engineering — start from our designs and existing tooling, then make it yours.

Choose from our developed cookware designs and proven tooling, then customize the finish, handle, lid, packaging and logo. ODM shortens the path to a shelf-ready product: the structures are already engineered and certified-ready, so your time goes to positioning, not mold development.

What ODM gives you

Developed designs ready to brand

Start from existing, manufacturable cookware structures rather than a blank drawing — faster to sample, lower development risk.

Your finish, handle and packaging

Customize color, handle material, lid type, capacity, set configuration, packaging and logo on top of the base design.

Patent-backed structures

Core technologies — composite impact bottom, pressure-cooker safety locking — are covered by 300+ patents across the group.

How it works

From consult to delivery in six steps

  1. 1

    Consult

    Tell us your spec, target market and price band.

  2. 2

    Design

    Engineers review and refine 2D / 3D drawings.

  3. 3

    Prototype

    Sample in 7–10 days, couriered worldwide.

  4. 4

    Feedback

    You approve or revise against the agreed spec.

  5. 5

    Manufacture

    Mass production matches the sample, 30–50 working days.

  6. 6

    Delivery

    Pack, certify and ship: FOB / CIF / DDP.

What you can customize

PackagingLogoColor & finishHandle materialLid typeCapacity & set

FAQ

ODM questions, answered

What is the minimum order quantity?

MOQ starts from 1,200 pcs per model, and the final figure depends on the model, finish, packaging and certification requirements. We sample first, in 7–10 days, before any production commitment.

Will mass production match the sample?

Yes. Mass production uses the same materials, processes and equipment as the approved sample, and finished goods are inspected against that reference sample before shipment.

What are your lead times?

Sampling is 7–10 days; standard production is 30–50 working days from confirmation. Urgent schedules can be discussed per project.

Can you meet our market’s compliance requirements?

We coordinate FDA, LFGB, CE, GS and region-specific testing (such as SASO/SABER) for your target market and category, alongside our company-wide ISO and BSCI certification.

Start your ODM project

Send your spec, drawing or reference sample with your target market and volumes. We reply with a plan, MOQ and next steps, usually within one business day.

Or reach sales directly: potobelo@zoombo.co · +86-663-3286181

Stainless steel cookware production at the Potobelo / Zoombo factory