Potobelo
OEM Cookware Manufacturing at the Potobelo / Zoombo stainless steel cookware factory

Custom solutions

OEM Cookware Manufacturer

Make to your spec or drawing — sampled in 7–10 days, built to match at volume.

  • Sampling 7–10 days
  • Production 30–50 days
  • MOQ from 1,200 pcs / model

Who it’s for

For buyers and engineering teams who arrive with their own drawings, spec or reference sample and need a factory that can reproduce it faithfully at scale.

Bring a 2D or 3D drawing, a written spec or a reference sample. Our engineers check it for manufacturability, cut tooling in-house, and sample in 7–10 days. Production then runs on the same materials, processes and equipment as the approved sample, so the bulk run matches it.

What OEM gives you

In-house tooling

Molds and fixtures are cut in our own toolroom, so your drawing does not wait on an outside supplier and revisions stay fast.

Manufacturability review

Engineers flag draft angles, wall thickness, base bonding and weld points before tooling, so the sample is right the first time.

Reference-sample inspection

Bulk output is checked against the approved sample at inspection, the control that keeps reorders consistent.

How it works

From consult to delivery in six steps

  1. 1

    Consult

    Tell us your spec, target market and price band.

  2. 2

    Design

    Engineers review and refine 2D / 3D drawings.

  3. 3

    Prototype

    Sample in 7–10 days, couriered worldwide.

  4. 4

    Feedback

    You approve or revise against the agreed spec.

  5. 5

    Manufacture

    Mass production matches the sample, 30–50 working days.

  6. 6

    Delivery

    Pack, certify and ship: FOB / CIF / DDP.

What you can customize

PackagingLogoColor & finishHandle materialLid typeCapacity & set

FAQ

OEM questions, answered

Will mass production match the sample?

Yes. Mass production uses the same materials, processes and equipment as the approved sample, and finished goods are inspected against that reference sample before shipment.

What is the minimum order quantity?

MOQ starts from 1,200 pcs per model, and the final figure depends on the model, finish, packaging and certification requirements. We sample first, in 7–10 days, before any production commitment.

What are your lead times?

Sampling is 7–10 days; standard production is 30–50 working days from confirmation. Urgent schedules can be discussed per project.

Can you meet our market’s compliance requirements?

We coordinate FDA, LFGB, CE, GS and region-specific testing (such as SASO/SABER) for your target market and category, alongside our company-wide ISO and BSCI certification.

Start your OEM project

Send your spec, drawing or reference sample with your target market and volumes. We reply with a plan, MOQ and next steps, usually within one business day.

Or reach sales directly: potobelo@zoombo.co · +86-663-3286181

Stainless steel cookware production at the Potobelo / Zoombo factory